Base mounting installation for LPPR1 was conducted in the period Aug.16-19, 2005. Eight peripheral Manta mountings were deployed in the surrounding sand utilizing a hydraulic jack hammer and load locker assembly. The central stainless baseplate with ball was installed as part of an integral concrete base support, constructed u/w on existing rock substrate with poured concrete.