Monday, April 17, 2006

LPPR1 ICON/CREWS Field Log: Puerto Rico CREWS Site

LPPR1 ICON/CREWS Field Log: Puerto Rico CREWS Site
J. Craynock & H. Casanova - 2 dives April 11,2006
- Adjusted tension on leg 3, reduced lean.
- Some concrete erosion noted on NW side of base, additional
concrete added and NE and SE sides cconcrete completed.
-Noticeable barnacle and hardshell growth on underside of all
spectra legs observed, some removed but should be cleaned
so that braid can be visible. Lashings need cleaning also.
Much thanks to Winston Rovira for his help driving the boat
and preparing concrete!

April 12, 2006
- Reduced tension on leg 2, pylon now straight.
Lashings retied. 2 SE side base lashings snug, might
have to be loosened next visit.

April 15, 2006
- H. Casanova removed both capillary tubes from the
CT's. Sent to manufacturer on Monday, April 17.
H. was snorkeling.